Skip to content
Błażej Mroziński
v0.29.1 November 21, 2026

Revamp review round 1

Case figures: EPAM gets a build-time flow diagram (FlowFigure, src/lib/diagram.ts, sourced numbers enforced by scripts/diagram.test.mjs). GR8 Tech shows

3 added 4 changed 1 removed

Added

  • Case figures: EPAM gets a build-time flow diagram (FlowFigure, src/lib/diagram.ts, sourced numbers enforced by scripts/diagram.test.mjs). GR8 Tech shows its values assessment results.
  • Job evaluation figures on /work/legitnyhr/: subcriterion weights against category boundaries, and two teams rating the same position across a category boundary. They are drawn at build time from an anonymized project (src/data/legitnyhr-figures.ts).
  • About at a glance: the three businesses, SWPS and the PhD in a panel (AtAGlance).

Changed

  • About (EN and PL) moves to the design system: eyebrow, name with diacritics, CV button, line-icon hobby cards, and a photography card without a link to the empty album page.
  • legitnyhr lane on the home page shows 2,000+ employees graded and 1,000+ job positions evaluated (legitnyhr client engagements, November 2026).
  • Home proof band shows five figures, centered when wrapping.
  • legitnyhr launch post: the retired app link and the tool wording are removed.

Removed

  • KPS, LSEG and Relevate case studies (moved to docs/backlog/, URLs 301 to /projects/), with their links and figures across home, About, company pages and the CV. The client strip drops LSEG and Relativity.